Pre-Submission Regulatory Plan Audit
Audit Stage 1 client concept floor-plan sketches (with AutoCAD & Revit .DXF schedule export) or Stage 2 full council submission packs against SANS 10400 Parts A–XA and municipal bylaws.
Verify room sizes, windows, stairs & setbacks + export .DXF CAD schedules before drafting sections.
Combine up to 12 sheets (Site, Floor, Sections, Elevations, Fire & 1:60 Drainage) for final pre-scrutiny.
Drawings are processed solely for your compliance audit. Plan Comply never uses client layouts to broker land, compete for projects, or sell leads. IP Charter →
Pre-submission screening & CAD drafting productivity aid for SACAP-registered professionals. Does not replace SACAP Form 1 sign-off or municipal approval. Statutory Notice →
Mark findings as Resolved once corrected in drawings or Ignored if covered by council departure or site waiver.
Chief Building Inspector Executive Summary
Drawing Set Completeness & Sheet Inventory
Evaluated habitable room floor areas and widths (Part C), stair geometry (Part M), fire separation (Part T), parking bays, and site setbacks without penalizing Stage 4 council sheets not yet drafted. Export the .DXF CAD Schedule & Notes Block below and follow the Stage 4 Council Detailing Roadmap when completing sections, elevations, 1:60 drainage, and SANS 10400 Form 1.
Municipal building control offices will require complete supplementary sheets (Ground & Upper Floor Layouts, Detailed Longitudinal Sections, Elevations, and SANS 10400-P Drainage Layout) before issuing an approval stamp. Habitable dimensions (Part C), fenestration (Part O), and drainage falls (Part P) are flagged as pending full drawing set submission.
Council Referral Point-by-Point Resolution Matrix
Exact SANS 10400 clauses, CAD drawing fixes, and BCO resubmission reply statements for your municipal referral letter.
CAD Schedule & .DXF Starter Pack
Calculated Fenestration & Glazing Minimum Schedule
SANS 10400-O & Part N| Ref | Room / Space | Floor Area (m²) | Min 10% Light (m²) | Min 5% Vent (m²) | SANS 1263-1 Safety Glass |
|---|---|---|---|---|---|
|
|
Safety Glass (SANS 1263-1)
Standard Glazing
|
Standard Council CAD Specification Notes (Included in .DXF)
CAD Layer: A-ANNO-NOTEStage 4 Council Detailing Roadmap
Factual engineering tolerances and mathematical formulas are synthesized under Section 12(1) Fair Dealing (Copyright Act 98 of 1978). Official SANS 10400 standards are copyrighted publications of the South African Bureau of Standards (SABS) — purchase certified editions at store.sabs.co.za.
Critical Non-Compliances (Must be resolved to avoid council rejection)
Mandatory RevisionsAdvisory Warnings & Drawing Notes
AdvisoriesVerified SANS 10400 Compliances
Compliant SectionsDraughtsperson Remediation & Drawing Punch-List
Track drawing amendments before final municipal lodgement
Municipal Pre-Submission Documentation & Statutory Guide
Official lodgement protocols, statutory forms, local hazard clearances, and Act 103 compliance
Statutory building plan lodgement authority under National Building Regulations Act 103 of 1977
Regional Office & Department Circulation Pathway
Assigned Office:
SANS 1936 Dolomite Land Stability Clearance Mandatory
Geotechnical HazardThis property falls within a designated high-risk dolomite formation precinct. Council building plan approval requires a certified Geotechnical Dolomite Stability Investigation, B4 Structural Engineer appointment under SANS 10400 Form 2, and formal written endorsement from the Council for Geoscience (CGS).
Section 34 NHRA Heritage Permit Required (>60-Year Structures)
Heritage Western CapeUnder Section 34 of the National Heritage Resources Act 25 of 1999, any alteration, addition, or demolition affecting a structure older than 60 years requires formal permit authorization from Heritage Western Cape (HWC) or the municipal Heritage Advisory Committee prior to building plan approval.
eThekwini D'MOSS Environmental Conservation Overlay
EPCPD Environmental Sign-offProperties intersecting or bordering designated Durban Metropolitan Open Space System (D'MOSS) corridors require formal sign-off from the Environmental Planning and Climate Protection Department (EPCPD). The site plan must clearly delineate the D'MOSS conservation boundary with zero structural encroachment.
Coastal Management Line & ICMA Sensitive Ecosystem Setback
ICMA Act 24 of 2008For properties situated within 100 m of the high-water mark or within municipal Coastal Management Lines (CML), development must comply with the Integrated Coastal Management Act. Submission requires certified coastal setback verification, dune preservation, and 1:100 year wave action flood line compliance.
Section 7(1) Common Council Delay Causes & Referral Pitfalls
Top statutory reasons plans submitted to are delayed or referred under Act 103
Statutory Municipal Submission Document Checklist
Mandatory statutory forms and appendices required by
Conditional Specialist & Municipal Clearances
Required only if triggered by site zoning, heritage overlay, or rational design scope.